CASE STUDY: Berwick Hospital
Client: Northumbria Healthcare NHS Foundation Trust
Location: Berwick
Sector: Healthcare
Project: Berwick Hospital
Project Overview
4C Lighting Solutions was appointed as the lighting partner to design and deliver wireless lighting and control to Berwick’s new £39m hospital.
The 10,500m2 facility will provide a range of new services that will improve patient care experience and staff day-to-day workflow processes, including endoscopy, maternity, as well as a new GP practice.
What makes 4C Lighting Solutions approach so unique? The only requirement for lighting and sensors is a mains connection. Using our Merit Mesh system, which will automatically form a mesh network once installed, offering maximum flexibility during the commissioning phase.
Benefits
The Merit Mesh system brings automation to the lighting installation. It improves efficiency, energy savings, and a reduced carbon footprint.
The experience of Merit Mesh with large hospital installations makes it the smartest choice for this type of hospital construction. Significant savings on construction can be achieved due to the flexibility and absence of control wiring.
Furthermore, it delivers a significant saving on the embedded carbon footprint of the installation.
The system is extremely flexible and configured on site to suit any applications.
Key features
- Significant installation time and cost savings
- Emergency lighting testing and reporting via email (no need to carry out manual checks)
- Monitoring of entire facility via cloud-based server.
- Fault reporting instantly
- Nurse call integration
- Energy monitoring
- Asset tracking: all wheelchairs, beds, and mobile machines can be located instantly by the system.
- Added safety: lights default on when fire alarm is triggered
- Automatic night lighting: no switches required
- Scalable to future buildings without the need for additional infrastructure
- 100% secure
- Increased energy savings to traditional control systems
- 5 year warranty